Tuesday, May 10, 2011

Optimus Primer

There's not a whole lot to report on today, other than the ceiling being primed (and it don't look too shabby, I gotta say) and B's trip to Ikea to return the 18" cabinets for a 15" one and accessories.

One issue that's yet to be resolved (and needs to be tout-de-suite) is the color for the kitchen. It needs repainting terribly. The foyer and downstairs bathroom have their colors already. It's the poor kitchen that's being left out.

No comments:

Post a Comment